The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
For the ungauged regions where many water resources projects are located, the daily flow hydrographs are normally required but unavailable. Hence, the regional flow duration curve must be generated using their relations to the underlying surface characteristics of watershed. In traditional procedures of rainfall-runoff model calibration, a fit of the observed flow hydrographs normally is selected...
Characteristics of the annual average, monthly average, and daily discharges of the Hailiutu River were investigated in this study. Change point detection reveals annual flow regime changes 4 times during the period from 1957 to 2007. Harmonic analysis identifies dominant annual and semi-annual periodic fluctuations of monthly average flow, but the magnitude of fluctuation and occurrence of peak flow...
This paper presents a new alternative technique for electric power generation based on municipal waste water. A methodology for evaluation of the reliability of the micro-hydro power generation system using Gaussian distribution approach and Simpsonpsilas 1/3rd rule have been described in this paper. Annual/daily flow duration curve (FDC) of the sewage power generation has been produced for design...
This paper describes the development of a sequential decision support system to promote hydroelectric power in North-West England. The system, composed of integrated models, addresses barriers to the installation of hydroelectric power schemes. Information is linked through an economic assessment which identifies different turbine options, assesses their suitability for location and demand; and combines...
Set the date range to filter the displayed results. You can set a starting date, ending date or both. You can enter the dates manually or choose them from the calendar.