-
[1] HSHP (Hanoi Planning and Investment Department), Report on assessment and supervision of overall investment in Hanoi in 2018–2020. The Yellow Book of Hanoi City, Vietnam, 2021.
-
[2] J. Vijayalaxmi and U. Khan, “Assessment of factors affecting time and cost overruns in construction projects”, in Risk, reliability and sustainable remediation in the field of civil and environmental engineering. Elsevier, 2022, pp. 511–521, doi: 10.1016/B978-0-323-85698-0.00028-9.
-
[3] M.S. Bajjou and A. Chafi, “Empirical study of schedule delay in Moroccan construction projects”, International Journal of Construction Management, vol. 20, no. 7, pp. 783–800, 2020, doi: 10.1080/15623599.2018.1484859.
-
[4] J.B. Yang and S.F. Ou, “Using structural equation modeling to analyze relationships among key causes of delay in construction”, Canadian Journal of Civil Engineering, vol. 35, no. 4, pp. 321–332, 2008, doi: 10.1139/L07-101.
-
[5] A.H. Memon, I.A. Rahman, M.R. Abdullah and A.A. Azis, “Factors affecting construction cost in Mara large construction project: perspective of project management consultant”, International Journal of Sustainable Construction Engineering and Technology, vol. 1, no. 2, pp. 41–54, 2010. [Online]. Available: https://publisher.uthm.edu.my/ojs/index.php/IJSCET/article/view/62. [Accessed: 02 Nov. 2023].
-
[6] R.F. Aziz and A.A. Hakam, “Exploring delay causes of road construction projects in Egypt”, Alexandria Engineering Journal, vol. 55, no. 2, pp. 1515–1539, 2016, doi: 10.1016/j.aej.2016.03.006.
-
[7] I. Mahamid, “Analysis of schedule deviations in road construction projects and the effects of project physical characteristics”, Journal of Financial Management of Property and Construction, vol. 22, no. 2, pp. 192–210, 2017, doi: 10.1108/JFMPC-07-2016-0031.
-
[8] C.S. McCahon, “Using PERT as an approximation of fuzzy project-network analysis”, IEEE Transactions on Engineering Management, vol. 40, no. 2, pp. 146–153, 1993.
-
[9] O. Okmen and A.A. Oztas, “CPM-based scheduling method for construction projects with fuzzy sets and fuzzy operations”, Journal of the South African Institution of Civil Engineering, vol. 56, no. 2, pp. 2–8, 2014.
-
[10] S. Chanas and P. Zielinski, “Critical path analysis in the network with fuzzy activity times”, Fuzzy Sets and Systems, vol. 122, no. 2, pp. 195–204, 2001, doi: 10.1016/S0165-0114(00)00076-2.