The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
The present paper presents a Cyber Physical Power System (CPPS) framework based on the Service-Oriented Architecture for proactive transmission grids control, modeling and monitoring. CPPS paradigm aims at integrating and coordinating computation, networking, and physical processes according to a holistic vision of the transmission system. The key feature of the proposed framework is the ability of...
The paper addresses the problem of Dynamic Line Rating (DLR) estimation for OverHead transmission Lines (OHLs) in the context of Wide Area Monitoring Systems (WAMSs). DLR is universally recognized by experts from academia and industry as one of the most viable solution for a reliable exploitation of the real power systems thermal loadability margins. In this domain, the large quantity of synchronized...
Renewable energy sources (RES), are widely recognized as an effective solution to face with the rapid depletion of oil resources and an interesting energy option to ensure the energy supplies security and the meeting of the targets imposed by the international regulatory frameworks devoted to contrast the global warming. Wind energy source is undoubtedly one of the primary energy source able to provide...
The quality of the transmission service, in Italy, is managed by the TSO. Although the transmission network is meshed, it often happens a disconnection of some users (cabins processing business distributor or customers AT) due to a fault. The Authority issued the well-defined guidelines that regulate payments and premiums which the TSO is subject. The outages may occur due to events occurring at atypical...
This paper analyzes innovative devices to optimize the energy flows transmission on existing overhead lines. Indeed sometimes the structural asset isn't adequate to manage energy generated by Renewable Energy Source (RES) in particular operating conditions. In addiction the outage of primary substations on the grid and the increase of consumptions have caused growing load currents. In order to satisfy...
The increase of Renewable Energy Sources (RES) production units has caused significant changes in the electrical system configuration. The existing structural asset isn't adequate to dispatch these new power flows that, at same time, should be favorite by various TSOs in order to obtain incentives. The outage of primary substations on the grid and the increase of consumptions have caused growing load...
The paper deals with the possibility of installing a double-circuit gas insulated transmission line (GIL) in the pilot tunnel of the new planned railway galleries Fortezza–Innsbruck. The high GIL power ratings with very low power losses would allow a strong and highly efficient energy exchange particularly useful for the future European Market and could represent a new fundamental step in reconstructing...
Set the date range to filter the displayed results. You can set a starting date, ending date or both. You can enter the dates manually or choose them from the calendar.