The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
Stochastic optimal power flow (OPF) formulations that minimize the expected operating costs over forecast scenarios generally result in lower costs than the standard (deterministic) OPF problem for power systems with significant forecast error, for example, from renewable energy sources. However, this type of stochastic OPF problem is more computationally demanding than the deterministic OPF, and...
Due to the increase of intermittent renewable energy sources, it is becoming more important to consider renewable generation forecast error when solving the optimal power flow (OPF) problem. The stochastic OPF, which uses multiple forecast scenarios, generally leads to a lower cost compared to the standard deterministic OPF, which uses a single forecast. However, the stochastic OPF is computationally...
When energy storage units (ESUs) within the distribution grid, such as batteries, provide local services such as supporting the integration of photovoltaics, peak shaving, and infrastructure upgrade deferral, they are inactive or only partially used most of time. Moreover, they are often not profitable because of their high investment costs. Their unused capacities could be used to provide power system...
When energy storage units, such as batteries, are installed to support photovoltaics and defer power system upgrades they are inactive or only partially used most of time. Their unused capacities could be used to provide frequency control, allowing them to generate additional revenues. However, the challenge is to decide how much of their energy and power capacities to allocate to either service....
When energy storage units (ESUs) within the distribution grid, e.g. batteries, provide local services such as PV integration support, peak shaving, and infrastructure upgrade deferral, they are inactive or only partially used most of time. Moreover, they are often not profitable because of their high investment costs. Their unused capacities could be used to provide power system services, such as...
Due to their fast responsiveness, energy storage units such as batteries can provide fast frequency control to power systems. However, when the control signal is biased or substantially autocorrelated, they cannot provide services for extended periods of time because they have limited energy capacities. To improve the ability of batteries to provide frequency control, we can offset their frequency...
The shift in the electricity industry from regulated monopolies to competitive markets as well as the widespread introduction of fluctuating renewable energy sources bring new challenges to power systems. Some of these challenges can be mitigated by using demand response (DR) and energy storage to provide power system services. The aim of this paper is to provide a unified framework that allows us...