The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
A 1 nA current reference circuit is designed in semiconductor laboratory (SCL) 0.18 μm standard threshold voltage CMOS technology under 1.8 V power supply. The reference current is extremely immune to supply variation and shows a line sensitivity of 0.002%/V at post layout simulation level, over a wide range of supply variation from 0.5 V to 3.5 V. The line sensitivity is much smaller than any relevant...
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline, and required processing length. The jobs need to be scheduled on a machine so that at most g jobs are active at any given time. The duration for which a machine is active (i.e., “on”) is referred to as its active time. The goal is to find a feasible...
Ride sharing is a sustainable, environmentallyfriendly mode of commute that is gaining in popularity. Though there are well-established commercial service providers, there are not many platforms for facilitating peer-to-peer ride sharing, especially in a dynamic scenario, integrated with multi-modal trip planners. Such systems would need to be highly searchoptimized for retrieval of multiple potential...
We consider the problem of fair resource allocation for tasks where a resource can be assigned to at most one task, without any fractional allocation. The system is heterogeneous: capacity and cost may vary across resources, and different tasks may have different resource demand. Due to heterogeneity of resources, the cost of allocating a task in isolation, without any other competing task, may differ...
The energy costs for cooling a data center constitute a significant portion of the overall running costs. Thermal imbalance and hot spots that arise due to imbalanced workloads lead to significant wasted cooling effort - in order to ensure that no equipment is operating above a certain temperature, the data center may be cooled more than necessary. Therefore it is desirable to schedule the workload...
Frequently, ISPs charge for Internet use not based on peak bandwidth usage, but according to a percentile (often the 95th percentile) cost model. In other words, the time slots with the top 5 percent (in the case of 95th percentile) of data transmission volume do not affect the cost of transmission. Instead, we are charged based on the volume of traffic sent in the 95th percentile slot. In such an...