The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
A black start is the process of restoring a power station to operation without relying on external power sources. Normally, the electric power used within the plant is provided from the station generators. The high-voltage grid provides station service power through the transmission lines if all the main generators are shut down. This off-site power source is not available during a wide-area outage...
Coordination between generator overcurrent voltages controlled relays (51 V) and transmission line directional overcurrent relays (67) represent a tedious task in power system protection. It depends heavily on network behavior and system parameters. Mis-coordination is sometimes happened between the two relays. In this paper an intelligent modular protection system is proposed for relays parameter...
Generation stations are considered extremely vital part of power system. Overcurrent voltage controlled relays are extensively used as backup protection of generators. Coordination between generator overcurrent voltage controlled relays and transmission line directional overcurrent relays represents a tedious task in power system protection as it depends heavily on network topology and system parameters...
The PacifiCorp Jim Bridger Power Plant has 2.2 GW of installed capacity and is connected to the main grid by three 345 kV series-compensated lines. These lines are, on average, over 200 miles long. In order to operate at full capacity and maintain stability during a system contingency, Jim Bridger requires a generation-shedding remedial action scheme (RAS). PacifiCorp is modernizing and upgrading...