The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
Loss-Of-Excitation (LOE) condition of a generator may cause severe damages on both generator and the interconnected systems. This paper analyses the behaviours of different LOE protection schemes, such as R-X, G-B, P-Q and U-I schemes, for a hydro generator, which is connected to an infinite bus. Based on the simulation results, the reliability and stability of existing LOE protection schemes are...
Distributed generation is increasingly likely to play a major role in electricity supply systems as recognition is made of its low carbon credentials. However, the integration of these units at distribution voltages is a major challenge for utilities. One particular issue is that generators may, unintentionally, continue to supply local demand when areas of the network are isolated from the main system...
With the integration of large scale wind power, the characteristics of power system operation has been changing, and, some problems come forth. On-line security assessment and control decision support system provides the stability and security state message for dispatcher in time, and, some suggestions to improve the level of power system stability and security. To suit the requirements of large amount...
With the increased use of renewable wind energy, wind farms are being built in remote areas, often far from load centers. The required long transmission lines are often constructed with series capacitive compensation to electrically shorten the lines. Events in the transmission system can cause interactions between the series capacitors and the system's inherent impedance which can result in sub-synchronous...