The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
Trico Electric Cooperative Inc (Trico) is a nonprofit cooperative serving more than 38,000 rural customers in southern Arizona. Trico is challenged with managing a distribution system with a wide geographical dispersion. Trico required a system to centralize, control and manage access to all of its substation devices and related data. Trico sought to diversify available substation information and...
Distribution Systems traditionally have a tree-like structure with several branches. They supply loads that vary through the day and as a result, some branches are loaded more than others are. By reconfiguring the system, loads from the overloaded branches may be moved to under-loaded branches. Consequently, loads in the branches can be balanced so that the real power losses are reduced and the voltage...
The interest in the integration of distributed generation into distribution systems has been increased in different countries all over the world as economic and environmental factors drive new technologies to be more efficient and less polluting than their earlier counterparts. As the penetration level of DG increases, the distribution system performance has to be analyzed in details. This work investigates...
In this paper, the placement and sizing of Distributed Generators (DG) in distribution networks are determined using optimization. The objective is to minimize the loss and to improve the reliability at lowest cost. The constraints are the bus voltage, feeder current and the reactive power flowing back to the source side. The placement and size of DGs are optimized using a combination of Discrete...