This paper introduces the compressed air supply network based on the theory of evolution of the optimization scheduling control system. According to enterprise widespread surplus compressed air compressor, unloading operation by venting waste energy problems. The control system adopts multiobjective optimization control strategy, which can effectively solve the compression machines with high efficiency, energy-saving, output control problem of multi-objective synthetically. Through the compressed air supply one realization of the network operation and energy balance pressure of the target