This paper presents a new method to allow more flexibility on the scheduling of messages across a fieldbus in overload situations. The method proposes the on-line adaptation of the sampling period to the bus load, trying to keep it as low as possible during overloads. The sampling period is allowed to change inside an interval corresponding to 4 to 10 samples per rise time. To assess the solution herein presented, a distributed adaptive control system was implemented in TrueTime, using the FTT-CAN protocol, for the communication infrastructure, a pole-placement controller and a model for the identification of plant parameters that takes into account the network-induced jitter