In this paper we propose to investigate, model, optimize and simulate the connection of a 3Kwc domestic photovoltaic generator to the three-phase power network throughout a current-controlled voltage source inverter. The current-controlled voltage source inverter tasks are:
The totality of the produced energy by the PVG has to be injected in the network, whereas the electricity requirement for domestic use has to be withdrawn from the network supply .This is in order to avoid batteries storage problems .As well as the realization of a decoupling system which can protect the generator from perturbations that can reach the electrical network supply.