Decision Making in Manufacturing and Services > 2007 > Vol. 1, no. 1-2 > 5-23
Źródło
Abstrakt
Identyfikatory
ISSN czasopisma : | 1896-8325 |
e-ISSN czasopisma : | 2300-7087 |
Autorzy
Słowa kluczowe
Informacje dodatkowe
Wydawca
Obszary wiedzy
Bibliografia
-
1. Allahverdi, A., Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times, International Journal of Production Economics 103 (2006), 386–400.
-
2. Allahverdi, A., Minimizing mean flowtime in a two-machine flowshop with sequence independent setup times, Computers & Operations Research 27 (2000), 111–127.
-
3. Allahverdi, A., and Al-Anzi, F., A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times, European Journal of Operational Research 169 (2006), 767–780.