The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
In order to match the output capacity of a geothermal heat pump system (GHPS) with the actual load requirement, research has been carried out in finding the influence of two systematic parameters, the water flow rate inside the condenser and the compressor input frequency on the GHPS operation. Experiments are done on a small-scale GHPS at the water flow rate ranging from 0.054 kg/s to 0.174 kg/s...
In order to match the output capacity of a geothermal heat pump system (GHPS) with the actual load requirement, research has been conducted in searching for suitable adjusting methods for the GHPS and on the subsequent effects on the working parameters of the GHPS. Firstly, several methods are compared, and it is found that the method of adjusting the compressor's rotation speed using a transducer...
Set the date range to filter the displayed results. You can set a starting date, ending date or both. You can enter the dates manually or choose them from the calendar.