The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
This paper presents a method for conducting continuation power flow simulation on high-solar penetration distribution feeders. A load disaggregation method is developed to disaggregate the daily feeder load profiles collected in substations down to each load node, where the electricity consumption of residential houses and commercial buildings are modeled using actual data collected from single family...
This letter presents a performance enhancement for a previously developed direct load control scheme that controls (toggles on/off) thermostatically controlled appliances (TCAs) through two-way communication infrastructure for providing load balancing services. In addition to device operating temperature and on/off status (TCA states), two more pieces of information, rates of temperature increase...
Currently, SLC-MLC hybrid SSD (solid state disk) products become mature. Phase-change random access memory (PRAM) is one of the new non-volatile memory materials used to enhance the limitation of original SLC-MLC hybrid SSD. Through reorganizing the basic functional modes among SLC, MLC, and PRAM, we proposed a new hybrid SSD architecture named PRAM-SLC-MLC Hybrid SSD (PH-SSD), in which a hierarchical...
Construction project is regarded as a complex network system in which quality reliability is an important index to express quality grade, so quality -cost Optimization is one of the most crucial aspects of construction project planning, which in fact is a multi objective optimization problem. A mathematical model is established and an evolutionary algorithm genetic algorithm (GA) was employed to solve...
Set the date range to filter the displayed results. You can set a starting date, ending date or both. You can enter the dates manually or choose them from the calendar.