The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
Chinese Fusion Engineering Test Reactor (CFETR) is a test tokamak reactor to bridge the gap between ITER and future fusion power plant. As its objectives are to demonstrate generation of fusion power and to realize tritium self-sufficiency, the tritium breeding ratio (TBR) is a key design parameter. In the blanket design and optimization, the structures such as the first wall (FW), cooling plate (CP),...
Chinese Fusion Engineering Testing Reactor (CFETR) is a test tokamak reactor to bridge the gap between ITER and future fusion power plant and to demonstrate generation of fusion power in China. Fusion reactors have the characteristics of a strong anisotropic neutron flux distribution, wide range of neutron energy and spatial non-uniformity of the power density distribution caused by the external fusion...
Set the date range to filter the displayed results. You can set a starting date, ending date or both. You can enter the dates manually or choose them from the calendar.