The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
CCHP (combined cooling, heating and power) systems have good performance as black-start units. It is the most important black-start unit in areas which do not have hydro power units. In this paper, the CCHP system is designed and planned under extra consideration of it serving as a black-start unit. It puts forward an optimized planning (allocation) model for CCHP systems with the consideration of...
During last stage of network reconfiguration after major blackout, loads should be picked up in sequence with considering certain constraints, which is a multi-constraint, non-linearity, integer programming problem. This paper proposes a combinatorial optimization model with considering the sequencing problem of load pickup, in which effects of pickup sequence are taken into consideration in both...
This paper firstly proposesa method for modeling charging/swapping load distribution of electric taxi. With this method, Monte Carlo Method and Dijkstra Algorithm are adopted to simulate the electric taxi's operation behavior based on the analysis of its operation characteristics. Then facility optimization model is proposed to minimize the life circle cost (LCC) of charging/swapping facilities and...
Based on the theory of non-convex interval goal programming and the discrete resources ideology, this paper constructs three basic storage resources allocation models, to illustrate the relationship between the aggregate requirement and the gross capability of storage in a group enterprise. Numerical results for the oil country tubular goods (OCTG) of 17 subcompanies of a group oil enterprise, verified...
Set the date range to filter the displayed results. You can set a starting date, ending date or both. You can enter the dates manually or choose them from the calendar.