The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
This paper provides a novel technique to represent in a reduced, or compact, way temporal variability in transmission expansion planning (TEP). This reduction is handled by means of “snapshot selection.” Instead of taking into account all the possible operational states and their associated optimal power flow, a reduced group of them is selected that is representative of all the states that should...
Private investors, flexibility, efficiency and environmental requirements from deregulated markets have led the existence and building of a significant number of combined-cycle gas turbines (CCGTs) in many power systems. These plants represent a complex optimization problem for the short-term planning unit commitment (UC) carried out by independent system operators due to their multiple operating...
In this paper, we propose a method to analyze the amount of operation reserves procured in a system based on two stages. The first stage is a detailed hourly unit commitment and the second stage is a simulation model with a shorter time period. The method is applied to the Spanish hydrothermal system and several cases are analyzed to determine the impact of the time period in the use of the operation...
This paper presents a new methodology for long-term transmission planning over large systems. The developed approach aims at finding the optimal design of a large grid including its modular development plan over a long time horizon. Advanced optimization and simulation methods have been investigated to tackle this very large and complex problem, which includes highly combinatorial aspects and stochastic...
Set the date range to filter the displayed results. You can set a starting date, ending date or both. You can enter the dates manually or choose them from the calendar.