The Infona portal uses cookies, i.e. strings of text saved by a browser on the user's device. The portal can access those files and use them to remember the user's data, such as their chosen settings (screen view, interface language, etc.), or their login data. By using the Infona portal the user accepts automatic saving and using this information for portal operation purposes. More information on the subject can be found in the Privacy Policy and Terms of Service. By closing this window the user confirms that they have read the information on cookie usage, and they accept the privacy policy and the way cookies are used by the portal. You can change the cookie settings in your browser.
The article describes trackside part of the ERTMS / ETCS system installed on Railway Research Institute Test Track Centre in Żmigród where functional tests of „trackside Control-Command and Signalling" interoperability constituent prototypes i.e. eurobalises were conducted based on the elaborated test schedule and the conditions contained in the specifications of Susbset 040 and Subset 036. Moreover...
This article describes the procedures, standard parameters and control requirements to be performed in order to achieve EC verification of a Control-Command and Signalling On-board Subsystem. An analysis of issues related to the assessment of the on-board subsystem is presented in terms of the necessary checks that must be performed by a notified body and the issues of interoperability tests of the...
Set the date range to filter the displayed results. You can set a starting date, ending date or both. You can enter the dates manually or choose them from the calendar.