Negrellisteg
In Spring 2021 the Negrellisteg over the Zurich railway field was opened. With this, intensive and attractive planning‐ and building phases ended. This report gives an impression to technical aspects of the structure and the building period of this 160 m long pedestrian bridge. In particular, the challenges of a monolithic structure which is founded on existing concrete infrastructure are mentioned. Further, dynamic aspects which are very important for steel pedestrian bridges are discussed. Last but not least the construction process in the environment of the biggest Swiss railway station needed as well special attention.